Case History Example: Prototype Circuits Inc. Scarborough, Ontario Problem: When Prototype Circuits Inc., a world innovator in the production of high tech circuit boards, required interior partitioning for their manufacturing facility they initially considered block construction; but given their ever changing needs, block construction was not a viable solution. They investigated stud and drywall but […]
Case History Example: Northern Telecom, Brampton, Ontario Problem: Faced with meeting a smoking by-law deadline, Northern Telecom’s digital switching plant discovered that it did not have adequate space to house its smokers. “We determined the percentage of smokers and decided we would need five smoking areas placed at various locations throughout the plant,” says Jim […]
Case History Example: Ford Motor Company of Canada Limited Oakville, Ontario, Canada Problem: Ontario Truck Plant re-tools for the launch of the all new F series trucks. Over two million square feet of manufacturing and assembly plant layout is to be completely reconfigured in only 30 days. There are a multitude of canteens, production offices, […]
Case History Example: Brock Telecom Limited, Brockville, Ontario,Canada Problem: Brock Telecom needed office space on their manufacturing floor but couldn’t afford the inconvenience of having contractors disrupt their day to day operations. Solution: ProPart Modular arrived on site on a Friday afternoon and had only the weekend to construct a 50’x 70′ inplant office facility […]
Case History Example: Exopack Toronto, Ontario Canada Problem: Needing to separate and safely isolate a lunchroom for their staff in Toronto, Exopack’s busy manufacturing facility needed to convert limited space into both a storage facility and a future lunchroom. Solution: The staff at ProPart Modular provided a customized System 40™ In Plant Office to accommodate […]
Case History: Equipco Bridgeville, Pennsylvania Problem: Equipco, the oldest Hyster forklift dealer in the United States and one of ProPart Modular’s dealers, approached us to provide them with a much needed in plant office for their service department in their forklift service area. In January, Equipco had launched a dedicated Allied sales team to better […]
Case History Example: Pizza Pizza Toronto, Ontario, Canada Problem: Pizza Pizza approachedProPart Modulars to find a Modular Space Solution to their unique requirements. In the past, Pizza Pizza had used trucks and tents at special events. With the logistics of daily operations for a venue like the Canadian National Exhibition (18 day attendance exceeding 1 […]
Case History Example: Imperial Leaf Tobacco Aylmer, Ontario, Canada Problem: ProPart Modular helps to solve noise and dust problems. Imperial Leaf Tobacco required that the picking line be separated from the processing areas of the plant. This area had to be isolated for both sound and dust control. A number of problems would make this […]
ProPart Modular has the strength and expertise to design and build just about anything imaginable. A fully certified weld shop forms the backbone of ProPart Modular’s operation, allowing us to fabricate complex structural components such as this crane-liftable office. Case History Example: Tiverton, Ontario Problem: A Nuclear Power generating facility in Ontario had the need […]
Case History Example: FSI International Calgary, Ontario Canada Problem: FSI-International of Calgary needed a transportable prefabricated custom modular production line office and supervisory pulpit for a Brine processing plant to be manufactured in Canada and later shipped to Russia. Solution: ProPart Modular partnered with FSI-International of Calgary to create a custom elevated structure measuring 8’x24′ […]