Case History Example: Kawneer Toronto, Ontario Problem: Needing to address and implement new security and safety measures, Kawneer had to secure both shipping and receiving areas for their plant in Toronto. Solution: ProPart Modular customized Modular Wire Partitions provided an ideal way to contain unauthorized personnel from accessing the manufacturing area of the plant, ensuring […]
Case History Example: SKD Company Milton, Ontario Problem: SKD Company retools to meet increased demand as a “right on time” supplier for the automotive industry. They are expecting delivery of new presses and need more production space. The new equipment has to be in place and operational by the time production staff returns from the […]
Case History Example: MBRP. Huntsville, Ontario Problem: MBRP needed a mezzanine to store inventory parts, while at the same time showcasing their detailing efforts. Solution: Having already experienced the convenience of an in plant office MBRP Inc. turned to ProPart Modular again to provide additional modular space storage. ProPart Modular worked with MBRP’s existing infrastructure […]
Case History Example: The Jones Apparel Group Concord, Ontario Problem: The Jones Apparel Group worked with the ProPart Modular design team to solve an interior space problem. Although it was a brand new facility, floor space was at a premium. Solution: ProPart Modular’s solution was to utilize the unused space above their existing shipping bays […]
Case History: HTS Communications Newmarket, Ontario Problem: Jay Cooke of HTS Communications in Newmarket had a problem with expansion and was desperate to find a solution. Jay turned to ProPart Modular for advice on how best to create new storage space within a limited warehouse facility at their corporate location in Newmarket. Solution: Utilizing a […]
Case History Example: Glenoak Bossman Inc. Mississauga, Ontario Problem: Glenoak Bossman had been in their new warehouse facility for only a year when they ran out of office space. ProPart Modular designed a 25’x 25′ inplant office area to accomodate operations personel. Just before construction began, it was realized that additional space would be required […]
Case History Example: Canada Wire, Fergus, Ontario Problem: The Project Engineer at Canada Wire required immediate additional office space in their Fergus plant. An expansion of an existing inplant office area was considered, but floor space in the manufacturing area was limited and relocating equipment was not a practical option given the tight schedule. The […]
Case History Example: Acco Canada, Willowdale Ontario, Canada Problem: When Acco Canada decided to move their managerial staff into the manufacturing area, a new two storey inplant office was designed and installed by ProPart Modular. As intended, the new office area was ideal for close contact with the manufacturing process – but the location was […]
Case History Example: AECL Mississauga, Ontario Problem: Atomic Energy of Canada had no excess space in their Bonded Warehouse. They needed ProPart Modular to provide a proven, turnkey modular solution. Solution: ProPart Modular was able to supply and install two mezzanines, racking, cantilever racking and shelving. AECL ‘s Mezzanine decking consists of highly durable powder […]
Case History Example: Roler Toronto, Ontario Problem: Experiencing rapid growth at Roler, it was determined they needed new office space, a secure document storage area and an executive office expansion, all within their existing plant location. Solution: Tired of the drywall dust associated with conventional construction, Sherry Smith at Roler turned to ProPart Modular to […]