Case History: NuTech Engineering Inc. Milton, Ontario Problem: NuTech required a fully demountable custom enclosure for an oversized laser robotics assembly, to be disassembled and shipped overseas at a later date. Solution: System 40™ components were used to create a fully demountable custom enclosure. Due to the size of the large robotics device contained within, an oversized […]
Case History: Techspan, Mississauga, Ontario Problem: Techspan wanted to remodel their executive corner offices. With an existing schematic they wanted to know if anyone could accommodate a custom design utilizing modular components. Solution: ProPart Modular did exactly what they asked “Not only did they accommodate our design requirements,” said Gerald Dunnigan, Chairman of Techspan Industries […]
Case History Example: Pfizer Pharmaceuticals Arnprior, Ontario Problem: Pfizer Pharmaceuticals, a large multinational pharmaceutical company needed a rather unique solution for wall dividers in a packaging area of their plant in Arprior. Solution: In a sensitive packaging area such as this, a dust free environment is critical, so extra measures need to be taken to […]
Case History Example: Atlas Tires Wholesale Inc. Mississauga, Ontario Problem: Atlas Tires Wholesale Inc. needed two separate In Plant Offices for their two busy Mississauga warehouses. Solution: Selecting from available In Stock inventory Atlas asked that ProPart Modular customize each unit to accommodate specific requirements. Surrounded by stacks and stacks of tires, these offices now provide usable, […]
Case History Example: Global Aerospace Mississauga, Ontario Problem: Having just moved into a brand new facility in Mississauga, Global Aerospace needed an In Plant office and Mezzanine structure for storage in their production plant. Solution: Global Aerospace purchased both a System 40™ In Plant office and Mezzanine structure from ProPart Modular. The ease and speed of installing a […]
Case History Example: Soft Drink Company Toronto, Ontario Problem: A major soft drink company needed a Smoke Shelter for staff at their headquarters location in Toronto but wanted it to match the existing architecture of their head office. Solution: They decided to go with a ProPart Modular solution. A custom 8′ x 12′ smoke shelter with tinted […]
Case History Example: Annan & Bird Lithographers Toronto, Ontario Problem: Having previously recognized the benefits of installing a System 40™ In Plant Office in their production area Annan & Bird Lithographers came to ProPart Modular with an additional request. They needed a staff lunchroom but had virtually no space. Solution: The solution? Add a mezzanine structure attached […]
Case History Example: MEP Drives Ltd. Oakville, Ontario Problem: Having just moved into a brand new facility in Mississauga, MEP Drives Ltd. realized the need for an In Plant office for their warehouse. Solution: After weighing the alternatives MEP went with ProPart Modular as their preferred supplier. Soon after taking delivery of the first unit […]
Case History: Custom Auto Display Toronto, Ontario Problem: An upscale car manufacturer needed to showcase their product line in a manner that was consistent with their showroom terminal buildings. The final display needed to be configured to easily facilitate transportation using either truck or train with a simple loading and unloading process. The unit needed to be […]
Case History Example: TTC Toronto, Ontario Problem: The Toronto Transit Commission needed additional office space to accommodate their growing maintenance division. Located in a prime area along the Toronto waterfront it was determined that the design of the new structure be consistent with the pre-existing look and feel of buildings already in place. Solution: A […]