Case History: J.J. McGuire Oshawa, Ontario Problem: J.J. McGuire, a general contractor servicing many industries, needed an exterior control room for one of their large automotive clients. The problem was the equipment to be housed outside was already in place. Solution: The specifics of this particular building required some creative thinking. To provide a cost […]
Case History Example: Soft Drink Company Toronto, Ontario Problem: A major soft drink company needed a Smoke Shelter for staff at their headquarters location in Toronto but wanted it to match the existing architecture of their head office. Solution: They decided to go with a ProPart Modular solution. A custom 8′ x 12′ smoke shelter with tinted […]
Case History: Custom Auto Display Toronto, Ontario Problem: An upscale car manufacturer needed to showcase their product line in a manner that was consistent with their showroom terminal buildings. The final display needed to be configured to easily facilitate transportation using either truck or train with a simple loading and unloading process. The unit needed to be […]
Case History Example: TTC Toronto, Ontario Problem: The Toronto Transit Commission needed additional office space to accommodate their growing maintenance division. Located in a prime area along the Toronto waterfront it was determined that the design of the new structure be consistent with the pre-existing look and feel of buildings already in place. Solution: A […]
Case History Example: Dearcroft Montessori School Oakville, Ontario Problem: Located on an historic estate within walking minutes of the town of Oakville, Dearcroft Montessori School blends into pleasant, treed surroundings on an attractive two-acre campus. When deciding to add a School Portable the prerequisite was that it mirror the upscale environment and aesthetic. Solution: A conventional […]
Case History Example: NTR Developments Mississauga, Ontario Problem: NTR Developments, a general contracting firm in Oakville, needed a large, prefabricated structure completed quickly. Solution: Time was of the essence and Noah Ramia of NTR was impressed with the quick turnaround possible with the PROKIT® solution. Recognizing the tremendous advantages of ProPart Modular’s new PROKIT® steel […]
Case History Example: Grand Erie District School Board Brantford, Ontario Problem: Wanting to avoid the typical School Portable solution the Grand Erie District School Board were looking for a more innovative and permanent solution for their expansion requirements. For the GEDSB 4 new classrooms, totaling more than 4,100 square feet and providing more than 100 […]
Case History: Siemens Toronto, Ontario Problem: Siemens needed an onsite Mobile Trailer to oversee the ongoing retooling efforts at the Point Lepreaux nuclear power facility in New Brunswick. Solution: ProPart Modular designed, manufactured and delivered a Mobile Trailer on time and on budget! A singlewide 12’x60’ mobile trailer, designed and engineered to meet specific new code requirements for […]
Case History: GO Transit Toronto, Ontario Problem: With the constant construction at Go Transit stations, the Government of Ontario’s Provincial Transportation Systems needed to find a solution to provide uninterrupted service while their various ticket selling locations were temporarily out of commission. Solution: ProPart Modular designed, manufactured and delivered a mobile ticket trailer on time […]
Case History: Crown Caisson Calgary, Alberta Problem: Crown Caisson required a fleet of mobile offices for use in the oil fields of Alberta. As well as being totally self contained, these trailers would also have to serve as sources of temporary power, be suitable for storage of tools and constructed to withstand the abuse of […]