Case History: DCR Systems Group Inc. Markham, Ontario Problem: DCR Systems Group Inc. required additional office space in their rapidly expanding warehousing facility in Richmond Hill. They needed a combined closed and open office structure with plenty of flexibility. Pictured above is a System 40 installation that provided both the open and private enclosed offices […]
Case History: GO Transit Toronto, Ontario Problem: With the constant construction at Go Transit stations, the Government of Ontario’s Provincial Transportation Systems needed to find a solution to provide uninterrupted service while their various ticket selling locations were temporarily out of commission. Solution: ProPart Modular designed, manufactured and delivered a mobile ticket trailer on time […]
Case History: Crown Caisson Calgary, Alberta Problem: Crown Caisson required a fleet of mobile offices for use in the oil fields of Alberta. As well as being totally self contained, these trailers would also have to serve as sources of temporary power, be suitable for storage of tools and constructed to withstand the abuse of […]
Case History Example: CAN DO Toronto, Ontario Problem: CAN DO the community alliance for new organization required a custom mobile office designed to attract youth – a roaming facility to provide information and referrals for employment, health, social services and education. Solution: ProPart Modular teamed up with Architect Rocco Maragna and the end result is […]
Case History: AECL Mississauga, Ontario Problem: Portability was critical for AECL’s modular space requirements. Needing to construct a remote control booth for a nuclear facility in New Brunswick, AECL needed a fully assembled double wide mobile trailer which could first be retrofitted with an extensive array of sophisticated computer hardware at AECL headquarters in Mississauga, […]
Case History Example: Kawneer Toronto, Ontario Problem: Needing to address and implement new security and safety measures, Kawneer had to secure both shipping and receiving areas for their plant in Toronto. Solution: ProPart Modular customized Modular Wire Partitions provided an ideal way to contain unauthorized personnel from accessing the manufacturing area of the plant, ensuring […]
Case History Example: Automated Welding Systems Markham, Ontario Problem: Automated Welding Systems, a world leader in the design of laser welders, provides their customers with a complete system – state of the art laser welders and a secure, light tight enclosure in which to control the process. They turned to Provincial Partitions to design and […]
Selectron approached Provincial Partitions Ltd. to provide a Smoking Shelter that would go ‘way above and beyond’ the requirements of what most ordinary smoking shelters provide. Not only did it need to be attached to the existing building and blend in with the décor, but it had to be secure as well. Add to that […]
Case History Example: MTCC Toronto, Ontario Problem: A local condominium developer needed a Smoke Shelter that met two specific requirements. First, it had to accommodate Ontario’s new Smoke Free Act code, and second, it had to be easily assembled and installed on a condominium rooftop. Solution: The first requirement was easy because ProPart Modular has […]
Case History: Willowdale Ontario Problem: An international sporting goods manufacturer required a guardhouse to accomodate their 24 hour security staff. The unit would have to be comfortable and self contained so that there would never be any reason for the post to be unmanned. Due to security issues, they were not able to contend with […]