Case History: Siemens Toronto, Ontario Problem: Siemens needed an onsite Mobile Trailer to oversee the ongoing retooling efforts at the Point Lepreaux nuclear power facility in New Brunswick. Solution: ProPart Modular designed, manufactured and delivered a Mobile Trailer on time and on budget! A singlewide 12’x60’ mobile trailer, designed and engineered to meet specific new code requirements for […]
Case History Example: Kruger Brampton, Ontario Canada Problem: Kruger needed to oversee their production line in a new state-of-the-art facility. It was determined that at the very least a two story office complex would be required. Solution: The staff at ProPart Modular provided a two story System 40™ In Plant Office to accommodate the client’s specific […]
Case History Example: Automated Jetting Systems Guelph, Ontario Problem: Automated Jetting Systems Needed an oversized E-Room enclosure for their clients new state-of-the-art powder application room. Solution: ProPart Modular’s patented ProWall™ paneling system provided the perfect solution for the oversize requirements. This completed custom enclosure with framed openings measures 31 x 41 ft. with continuous walls standing 23 […]
Case History Example: Surface Mount Technology Centre Markham, Ontario Problem: When the Surface Mount Technology Centre recently expanded their facility in Markham they also needed to accommodate an increase in office staff. An office environment was required that was both functional and suitable for the company’s executives. Solution: After considering many options, they felt that […]
Case History: DCR Systems Group Inc. Markham, Ontario Problem: DCR Systems Group Inc. required additional office space in their rapidly expanding warehousing facility in Richmond Hill. They needed a combined closed and open office structure with plenty of flexibility. Pictured above is a System 40 installation that provided both the open and private enclosed offices […]
Case History: GO Transit Toronto, Ontario Problem: With the constant construction at Go Transit stations, the Government of Ontario’s Provincial Transportation Systems needed to find a solution to provide uninterrupted service while their various ticket selling locations were temporarily out of commission. Solution: ProPart Modular designed, manufactured and delivered a mobile ticket trailer on time […]
Case History: Crown Caisson Calgary, Alberta Problem: Crown Caisson required a fleet of mobile offices for use in the oil fields of Alberta. As well as being totally self contained, these trailers would also have to serve as sources of temporary power, be suitable for storage of tools and constructed to withstand the abuse of […]
Case History Example: CAN DO Toronto, Ontario Problem: CAN DO the community alliance for new organization required a custom mobile office designed to attract youth – a roaming facility to provide information and referrals for employment, health, social services and education. Solution: ProPart Modular teamed up with Architect Rocco Maragna and the end result is […]
Case History: AECL Mississauga, Ontario Problem: Portability was critical for AECL’s modular space requirements. Needing to construct a remote control booth for a nuclear facility in New Brunswick, AECL needed a fully assembled double wide mobile trailer which could first be retrofitted with an extensive array of sophisticated computer hardware at AECL headquarters in Mississauga, […]
Case History Example: Kawneer Toronto, Ontario Problem: Needing to address and implement new security and safety measures, Kawneer had to secure both shipping and receiving areas for their plant in Toronto. Solution: ProPart Modular customized Modular Wire Partitions provided an ideal way to contain unauthorized personnel from accessing the manufacturing area of the plant, ensuring […]