Case History Example: Pegah Construction Ltd. Toronto, Ontario Problem: The City Of Toronto needed a Hazardous Materials Storage Buildings for household hazardous waste management. These buildings are specific-purpose structures intended for safe, secure and segregated storage of hazardous materials. Solution: Repeat customer, The City Of Toronto took delivery of a second Haz Mat unit provided […]
Case History Example: Ontario Place Corporation Toronto, Ontario Problem: In April, ProPart Modular was contacted by Ontario Place administration. Ontario Place, an internationally acclaimed cultural, leisure and entertainment parkland located on Toronto’s waterfront, required a building suitable for a gas bar outlet and retail store to be located at their south marina – a turn-key […]
Case History Example: SKD Company Milton, Ontario, Canada Problem: As part of a re-tooling process, ProPart Modular crews were on site relocating an existing System 40™ two storey office complex. SKD Company management decided that some of the personnel who had previously had office space in the two storey complex would be more effective closer […]
Case History Example: DeHavilland Air Craft Ontario, Canada Problem: DeHavilland Air Craft required additional office space but could not utilize floor space due to required manufacturing space. DeHavilland did not want a unit constructed on site due to the interruptions to manufacturing in the immediate area. Solution: ProPart Modular designed and prefabricated a 2 story […]
Case History Example: Daimler Chrysler Corporation Toledo, Ohio Problem: The Daimler Chrysler Corporation built a new facility in Toledo, Ohio to manufacture their Jeep. Chrysler was finding that they had a lot of down time because employees were leaving the manufacuring line to walk the considerable distance to the washroom facilities. Chrysler’s engineering department had […]
Case History Example: École Publique Le Couer Du Nord Kapuskasing, Ontario Problem: The École Publique Le Couer Du Nord in Kapuskasing, Northern Ontario, needed to create an extension to their existing school – but – without the disruption caused when using conventional construction. Not wanting typical school portables, they specifically requested that the school addition […]
Case History Example: SKD Company Milton, Ontario Problem: SKD Company retools to meet increased demand as a “right on time” supplier for the automotive industry. They are expecting delivery of new presses and need more production space. The new equipment has to be in place and operational by the time production staff returns from the […]
Case History Example: MBRP. Huntsville, Ontario Problem: MBRP needed a mezzanine to store inventory parts, while at the same time showcasing their detailing efforts. Solution: Having already experienced the convenience of an in plant office MBRP Inc. turned to ProPart Modular again to provide additional modular space storage. ProPart Modular worked with MBRP’s existing infrastructure […]
Case History Example: The Jones Apparel Group Concord, Ontario Problem: The Jones Apparel Group worked with the ProPart Modular design team to solve an interior space problem. Although it was a brand new facility, floor space was at a premium. Solution: ProPart Modular’s solution was to utilize the unused space above their existing shipping bays […]
Case History: HTS Communications Newmarket, Ontario Problem: Jay Cooke of HTS Communications in Newmarket had a problem with expansion and was desperate to find a solution. Jay turned to ProPart Modular for advice on how best to create new storage space within a limited warehouse facility at their corporate location in Newmarket. Solution: Utilizing a […]