Case History Example: Vanbots Construction Corporation Markham, Ontario Problem: Needing a Guardhouse that reflects Honda’s commitment to quality, Vanbots Construction Corporation turned to ProPart Modular for a custom solution. Solution: With a spacious air-conditioned interior, a private washroom and a custom roof that was craned into position on site, the new guardhouse at Honda welcomes […]
Case History: St. Lawrence Seaway Authority Cornwall, Ontario Problem: The St. Lawrence Seaway Authority in conjunction with Public Works Canada required that their outdated, poorly insulated Customs Booths, which were basically just transit shelters, be replaced with modern, properly wired, insulated and constructed portable booths. Solution: ProPart Modular was contracted to provide the end user […]
Case History Example: International Pharmaceutical Company Mississauga, Ontario Problem: Clean Room facilities pose the unique challenge of providing the most dust-free environment possible. An international pharmaceutical company required wall dividers that would prevent typical dust accumulation. Solution: The rugged nature of the ProPart Modular product line positioned ProPart favourably over the competition, but our willingness […]
Case History: Searle Canada Inc. Oakville, Ontario, Canada Problem: Searle had to increase production by adding another tablet line within an existing cleanroom. Divider partitions were required to eliminate the possibility of cross contamination. There could be no disruption to production, so the work had to be pre-fabricated and installed after hours. Solution: ProPart Modular […]
Case History Example: University of Toronto Mississauga, Ontario Problem: A standard off-the-shelf hazardous material containment building would not fill the bill so ProPart Modular was approached by a local University to design a custom heavy-duty enclosure. Solution: After careful consultation and analysis a design was arrived at that could safely and securely store the materials […]
Case History Example: Toronto Region Conservation Authority Woodbridge, Ontario Problem: Situated adjacent to the idylic Kortright Conservation Centre on the Humber River, and needing to accommodate code requirements regarding the storage of solutions used to study biological specimens, the Toronto Region Conservation Authority knew they needed a Hazardous Material storage building. Solution: With the increased […]
Case History Example: Pegah Construction Ltd. Toronto, Ontario Problem: The City Of Toronto needed a Hazardous Materials Storage Buildings for household hazardous waste management. These buildings are specific-purpose structures intended for safe, secure and segregated storage of hazardous materials. Solution: Repeat customer, The City Of Toronto took delivery of a second Haz Mat unit provided […]
Case History Example: Ontario Place Corporation Toronto, Ontario Problem: In April, ProPart Modular was contacted by Ontario Place administration. Ontario Place, an internationally acclaimed cultural, leisure and entertainment parkland located on Toronto’s waterfront, required a building suitable for a gas bar outlet and retail store to be located at their south marina – a turn-key […]
Case History Example: SKD Company Milton, Ontario, Canada Problem: As part of a re-tooling process, ProPart Modular crews were on site relocating an existing System 40™ two storey office complex. SKD Company management decided that some of the personnel who had previously had office space in the two storey complex would be more effective closer […]
Case History Example: DeHavilland Air Craft Ontario, Canada Problem: DeHavilland Air Craft required additional office space but could not utilize floor space due to required manufacturing space. DeHavilland did not want a unit constructed on site due to the interruptions to manufacturing in the immediate area. Solution: ProPart Modular designed and prefabricated a 2 story […]