Case History: NuTech Engineering Inc. Milton, Ontario Problem: NuTech required a fully demountable custom enclosure for an oversized laser robotics assembly, to be disassembled and shipped overseas at a later date. Solution: System 40™ components were used to create a fully demountable custom enclosure. Due to the size of the large robotics device contained within, an oversized […]
Case History Example: Pfizer Pharmaceuticals Arnprior, Ontario Problem: Pfizer Pharmaceuticals, a large multinational pharmaceutical company needed a rather unique solution for wall dividers in a packaging area of their plant in Arprior. Solution: In a sensitive packaging area such as this, a dust free environment is critical, so extra measures need to be taken to […]
Case History: Dana Canada Corporation Cambridge, Ontario Problem: Dana Canada needed a supplier with a longstanding expertise in the manufacture and installation of clean rooms to install a 3,000 square foot clean room in an existing facility. Solution: As a specialist in providing modular Clean Room structures, ProPart Modular is easily able to meet ISO Class […]
Case History Example: Automated Jetting Systems Guelph, Ontario Problem: Automated Jetting Systems Needed an oversized E-Room enclosure for their clients new state-of-the-art powder application room. Solution: ProPart Modular’s patented ProWall™ paneling system provided the perfect solution for the oversize requirements. This completed custom enclosure with framed openings measures 31 x 41 ft. with continuous walls standing 23 […]
Case History Example: Automated Welding Systems Markham, Ontario Problem: Automated Welding Systems, a world leader in the design of laser welders, provides their customers with a complete system – state of the art laser welders and a secure, light tight enclosure in which to control the process. They turned to Provincial Partitions to design and […]
Case History Example: International Pharmaceutical Company Mississauga, Ontario Problem: Clean Room facilities pose the unique challenge of providing the most dust-free environment possible. An international pharmaceutical company required wall dividers that would prevent typical dust accumulation. Solution: The rugged nature of the ProPart Modular product line positioned ProPart favourably over the competition, but our willingness […]
Case History: Searle Canada Inc. Oakville, Ontario, Canada Problem: Searle had to increase production by adding another tablet line within an existing cleanroom. Divider partitions were required to eliminate the possibility of cross contamination. There could be no disruption to production, so the work had to be pre-fabricated and installed after hours. Solution: ProPart Modular […]
Case History Example: RBW Graphics, Owen Sound, Ontario Problem: RBW graphics wanted their Quality Control team located in the midst of their production process area. The area was dusty and noisy, hardly an ideal environment for working with the precision equipment that was required. Size was another consideration, it had to be big enough to […]
Case History Example: Imperial Leaf Tobacco Aylmer, Ontario, Canada Problem: ProPart Modular helps to solve noise and dust problems. Imperial Leaf Tobacco required that the picking line be separated from the processing areas of the plant. This area had to be isolated for both sound and dust control. A number of problems would make this […]
ProPart Modular has the strength and expertise to design and build just about anything imaginable. A fully certified weld shop forms the backbone of ProPart Modular’s operation, allowing us to fabricate complex structural components such as this crane-liftable office. Case History Example: Tiverton, Ontario Problem: A Nuclear Power generating facility in Ontario had the need […]