Case History Example: The Jones Apparel Group Concord, Ontario Problem: The Jones Apparel Group worked with the ProPart Modular design team to solve an interior space problem. Although it was a brand new facility, floor space was at a premium. Solution: ProPart Modular’s solution was to utilize the unused space above their existing shipping bays […]
Case History: HTS Communications Newmarket, Ontario Problem: Jay Cooke of HTS Communications in Newmarket had a problem with expansion and was desperate to find a solution. Jay turned to ProPart Modular for advice on how best to create new storage space within a limited warehouse facility at their corporate location in Newmarket. Solution: Utilizing a […]
Case History Example: Glenoak Bossman Inc. Mississauga, Ontario Problem: Glenoak Bossman had been in their new warehouse facility for only a year when they ran out of office space. ProPart Modular designed a 25’x 25′ inplant office area to accomodate operations personel. Just before construction began, it was realized that additional space would be required […]
Case History Example: Canada Wire, Fergus, Ontario Problem: The Project Engineer at Canada Wire required immediate additional office space in their Fergus plant. An expansion of an existing inplant office area was considered, but floor space in the manufacturing area was limited and relocating equipment was not a practical option given the tight schedule. The […]
Case History Example: Acco Canada, Willowdale Ontario, Canada Problem: When Acco Canada decided to move their managerial staff into the manufacturing area, a new two storey inplant office was designed and installed by ProPart Modular. As intended, the new office area was ideal for close contact with the manufacturing process – but the location was […]
Case History Example: AECL Mississauga, Ontario Problem: Atomic Energy of Canada had no excess space in their Bonded Warehouse. They needed ProPart Modular to provide a proven, turnkey modular solution. Solution: ProPart Modular was able to supply and install two mezzanines, racking, cantilever racking and shelving. AECL ‘s Mezzanine decking consists of highly durable powder […]
Case History Example: Roler Toronto, Ontario Problem: Experiencing rapid growth at Roler, it was determined they needed new office space, a secure document storage area and an executive office expansion, all within their existing plant location. Solution: Tired of the drywall dust associated with conventional construction, Sherry Smith at Roler turned to ProPart Modular to […]
Case History Example: Prototype Circuits Inc. Scarborough, Ontario Problem: When Prototype Circuits Inc., a world innovator in the production of high tech circuit boards, required interior partitioning for their manufacturing facility they initially considered block construction; but given their ever changing needs, block construction was not a viable solution. They investigated stud and drywall but […]
Case History Example: Northern Telecom, Brampton, Ontario Problem: Faced with meeting a smoking by-law deadline, Northern Telecom’s digital switching plant discovered that it did not have adequate space to house its smokers. “We determined the percentage of smokers and decided we would need five smoking areas placed at various locations throughout the plant,” says Jim […]
Case History Example: Ford Motor Company of Canada Limited Oakville, Ontario, Canada Problem: Ontario Truck Plant re-tools for the launch of the all new F series trucks. Over two million square feet of manufacturing and assembly plant layout is to be completely reconfigured in only 30 days. There are a multitude of canteens, production offices, […]