Case History: AECL Mississauga, Ontario Problem: Portability was critical for AECL’s modular space requirements. Needing to construct a remote control booth for a nuclear facility in New Brunswick, AECL needed a fully assembled double wide mobile trailer which could first be retrofitted with an extensive array of sophisticated computer hardware at AECL headquarters in Mississauga, […]
Case History Example: Kawneer Toronto, Ontario Problem: Needing to address and implement new security and safety measures, Kawneer had to secure both shipping and receiving areas for their plant in Toronto. Solution: ProPart Modular customized Modular Wire Partitions provided an ideal way to contain unauthorized personnel from accessing the manufacturing area of the plant, ensuring […]
Case History Example: Automated Welding Systems Markham, Ontario Problem: Automated Welding Systems, a world leader in the design of laser welders, provides their customers with a complete system – state of the art laser welders and a secure, light tight enclosure in which to control the process. They turned to Provincial Partitions to design and […]
Selectron approached Provincial Partitions Ltd. to provide a Smoking Shelter that would go ‘way above and beyond’ the requirements of what most ordinary smoking shelters provide. Not only did it need to be attached to the existing building and blend in with the décor, but it had to be secure as well. Add to that […]
Case History Example: MTCC Toronto, Ontario Problem: A local condominium developer needed a Smoke Shelter that met two specific requirements. First, it had to accommodate Ontario’s new Smoke Free Act code, and second, it had to be easily assembled and installed on a condominium rooftop. Solution: The first requirement was easy because ProPart Modular has […]
Case History: Willowdale Ontario Problem: An international sporting goods manufacturer required a guardhouse to accomodate their 24 hour security staff. The unit would have to be comfortable and self contained so that there would never be any reason for the post to be unmanned. Due to security issues, they were not able to contend with […]
Case History Example: Vanbots Construction Corporation Markham, Ontario Problem: Needing a Guardhouse that reflects Honda’s commitment to quality, Vanbots Construction Corporation turned to ProPart Modular for a custom solution. Solution: With a spacious air-conditioned interior, a private washroom and a custom roof that was craned into position on site, the new guardhouse at Honda welcomes […]
Case History: St. Lawrence Seaway Authority Cornwall, Ontario Problem: The St. Lawrence Seaway Authority in conjunction with Public Works Canada required that their outdated, poorly insulated Customs Booths, which were basically just transit shelters, be replaced with modern, properly wired, insulated and constructed portable booths. Solution: ProPart Modular was contracted to provide the end user […]
Case History Example: International Pharmaceutical Company Mississauga, Ontario Problem: Clean Room facilities pose the unique challenge of providing the most dust-free environment possible. An international pharmaceutical company required wall dividers that would prevent typical dust accumulation. Solution: The rugged nature of the ProPart Modular product line positioned ProPart favourably over the competition, but our willingness […]
Case History: Searle Canada Inc. Oakville, Ontario, Canada Problem: Searle had to increase production by adding another tablet line within an existing cleanroom. Divider partitions were required to eliminate the possibility of cross contamination. There could be no disruption to production, so the work had to be pre-fabricated and installed after hours. Solution: ProPart Modular […]