Case History: J.J. McGuire Oshawa, Ontario Problem: J.J. McGuire, a general contractor servicing many industries, needed an exterior control room for one of their large automotive clients. The problem was the equipment to be housed outside was already in place. Solution: The specifics of this particular building required some creative thinking. To provide a cost […]
Case History: Canadian Babbitt Bearings Ltd. Brantford, Ontario Problem: Canadian Babbitt Bearings Ltd. required a new Quality Assurance Lab for their busy manufacturing plant in Brantford, Ontario. They needed an environment where the humidity and dust levels could be kept to within very strict tolerances, and the ceiling height needed to accommodate an oversized crane installed […]
Case History: Multimatic Richmond Hill, Ontario Problem: Long time client Multimatic needed a fully open 2 Story workspace area on both the ground floor and second story for their Quality Assurance Lab. Solution: Multimatics new quality assurance lab is a testament to the flexibility and re-purposing of ProPart Modular’s System 40™ two-story Mezzanines. Multimatics new structure is composed entirely of standard […]
Case History Example: TTC Toronto, Ontario Canada Problem: The Toronto Transit Commission, a long time and loyal client of ProPart Modular, needed additional in plant office space for their busy maintenance garage located in Toronto, Ontario. The only problem was; they were running out of space in an already crowded repair facility. Solution: After consulting […]
Provincial Partitions Wins Honourable Mention for Temporary Modular Special Application Building at the MBI 2014 Awards of Distinction From The MBI Award Criteria: Architectural Excellence The client approached Provincial Partitions with very specific requirements. They wanted a unique, upscale sales office for their busy car dealership that was to be both octagonal in shape, enabling a full 360° […]
Case History Example: Tech-Con Automation Burlington, Ontario Problem: Long time customer Tech-Con Automation needed a custom enclosure for one of their specialized waterjet robotic units. The enclosure and robotic unit needed first to be constructed in Tech-Con Automation’s Canadian plant, then later disassembled and shipped to Mexico where it could easily be reconstructed. Solution: ProPart […]
Case History Example: Schenker Mississauga, Ontario Problem: Schenker, a leading international provider of integrated logistics services, needed an in plant office in their busy Canadian headquarter location. They wanted support staff closer to the action Solution: ProPart Modular’s System 40™ In Plant Office was the perfect solution. Close to the loading docks, our patented System 40™ modular […]
Case History: Coffee Office, Oakville, Ontario Problem: The Coffee Office, a unique professional office rental service needed to convert 8500 square feet of empty industrial space into private, secure, individual executive offices. Solution: ProPart Modular was awarded the job because of a proven track record with sound reduction. With an STC rating of 44, ProPart […]
Case History: NuTech Engineering Inc. Milton, Ontario Problem: NuTech required a fully demountable custom enclosure for an oversized laser robotics assembly, to be disassembled and shipped overseas at a later date. Solution: System 40™ components were used to create a fully demountable custom enclosure. Due to the size of the large robotics device contained within, an oversized […]
Case History: Techspan, Mississauga, Ontario Problem: Techspan wanted to remodel their executive corner offices. With an existing schematic they wanted to know if anyone could accommodate a custom design utilizing modular components. Solution: ProPart Modular did exactly what they asked “Not only did they accommodate our design requirements,” said Gerald Dunnigan, Chairman of Techspan Industries […]