Atomic Energy Of Canada

Case History Example:
AECL MezzanineAECL
Mississauga, Ontario

Problem:
Atomic Energy of Canada had no excess space in their Bonded Warehouse. They needed Provincial Partitions to provide a proven, turnkey modular solution.

Solution:
Provincial Partitions was able to supply and install two mezzanines, racking, cantilever racking and shelving. AECL ‘s Mezzanine decking consists of highly durable powder coated checkerplate steel. The mezzanine floor capacity is rated at 125 psf UDL.

With our factory trained installation crew this jobs was completed on time, on budget providing a first class complete solution.

AECL MezzanineOur steel mezzanine structures are custom engineered to suit each and every job application. All structural components bolt together, ensuring complete flexibility in the event your needs change in the future. Provincial Partitions welding operations are CWB Certified.

Whether standard or custom, Provincial Partitions’ mezzanines are built to meet your specific requirements for space, cost, weight, appearance, maintenance and security. Also, using prefabricated structures can reduce construction time by as much as 40 percent!

To request a quotation on how your next building project might benefit by using our unique line of modular space solutions, please feel free to fill out our online RFQ form or contact us directly at sales@pro-part.com